RAMSET R150 Uživatelský manuál

Procházejte online nebo si stáhněte Uživatelský manuál pro Elektrické nářadí RAMSET R150. E/M/T_150_tool_prt_spd.qxd (Page 2) Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 16
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
RAMSET R150 TOOL
OPERATOR’S
SAFETY & OPERATING
INSTRUCTION MANUAL
DANGER
READ AND OBEY ALL SAFETY AND OPERATING
INSTRUCTIONS BEFORE OPERATING TOOL.
GAS POWERED, LOW VELOCITY
PISTON TYPE FASTENING TOOL
Zobrazit stránku 0
1 2 3 4 5 6 ... 15 16

Shrnutí obsahu

Strany 1 - RAMSET R150 TOOL

RAMSET R150 TOOLOPERATOR’S SAFETY & OPERATING INSTRUCTION MANUALDANGERREAD AND OBEY ALL SAFETY AND OPERATINGINSTRUCTIONS BEFORE OPERATING TOOL.GAS

Strany 2

PARTS SCHEMATIC10PARTS SCHEMATICR150 TOOL SCHEMATIC

Strany 3 - Center Punch Test Results

R150 TOOL SCHEMATIC (continued)PARTS SCHEMATIC11PARTS SCHEMATIC

Strany 4 - Batteries

RAMSET R150 TOOL PARTS LISTSKEY PART NUMBER DESCRIPTION1 336920 GRILL CAP2 336900 AIR FILTER 3 B0060A CAP SCREWS M5-30 W/WASHER (pkg of 4)4 339000 CAP

Strany 5

PARTS LIST13PARTS LISTRAMSET R150 TOOL PARTS LISTS(continued)KEY PART NUMBER DESCRIPTION32 339050 GAS DUCT ASSEMBLY33 B0037A CHAMBER SPRINGS (pkg of 2

Strany 6

Filters and Battery ContactsCleaning the filters and battery contacts on a regularbasis will help make your tool work more efficiently.To clean the fi

Strany 7 - FASTENING APPLICATIONS

ITW Ramset/Red Head warranty thatnew R150 power fastening tools, partsand accessories will be free fromdefects in material and workmanship for the per

Strany 8 - TOOL OPERATING INSTRUCTIONS

FOR TOOL REPAIR SERVICE CONTACT YOUR LOCALAUTHORIZED ITW RAMSET/RED HEAD DISTRIBUTOR OR CONTACTYOUR NEAREST RAMSET TOOL REPAIR CENTERWEST MIDWEST EAST

Strany 9 - QUICK CHANGE NOSE

Just as no one can merely read a book about driving an automobile and then hope todrive one safely, no one should attempt to use the R150 gas powered

Strany 10 - PARTS SCHEMATIC

Preparation For FasteningAcceptable Base MaterialsThe gas powered R150 tool is suitable for use in the following basematerials only:• Poured Concrete•

Strany 11

Fuel Cells and BatteriesFuel Cells• The fuel cell must be used at temperatures between -5° C (23° F) and 49° C (120° F).• At the beginning of each f

Strany 12 - PARTS LISTS

Installing the battery• Insert the battery into the tool as shown on the right with the clip toward the rear.• Note the LED light on the right side

Strany 13

SAFETY INSTRUCTIONSDANGERSAFETY INSTRUCTIONSDANGER6FAILURE TO FOLLOWINSTRUCTIONS CANCAUSE INJURY TO THETOOL OPERATOR OR TO BYSTANDERS.• Use the tool

Strany 14 - SERVICING/TROUBLESHOOTING

FASTENING APPLICATIONSFASTENING APPLICATIONS7FASTENING APPLICATIONSYour R150 tool can be used for a widerange of fastening needs in a variety ofbase m

Strany 15 - WARRANTY

TOOL OPERATING INSTRUCTIONSTOOL OPERATING INSTRUCTIONS8TOOL OPERATIONAlways check the tool first to make surethat it does not contain a fastener. If t

Strany 16 - WEST MIDWEST EAST

QUICK CHANGE NOSEThe R150 tool is equipped with a quickchange nose. This feature allows the userto change the work contact element tomeet various fast

Komentáře k této Příručce

Žádné komentáře